HOT MIX ASPHALT PAVING PROJECTS

Resource Management conducts Quality Control/Quality Assurance testing of many Hot Mix Asphalt Paving projects. We are capable in producing asphalt mix designs.  We have Nuclear Density testing machines and Non-nuclear density machines such as Pavement Quality Indicators for quality control on asphalt pavements.  Portable labs are at our disposal for on-site testing of asphalt and aggregate materials.

Resource Management has been working with Warm Mix Asphalts instead of the conventional asphalts used in Hot Mix Asphalt paving. This reduces the amount of heat required in paving, thus reducing the energy requirement for Contractors, harmful greenhouse gases and overall cost of the project.  The use of Warm Mix asphalts also allows paving in colder temperatures.

CEMENT STABILIZED SUBGRADES

Resource Management produces Designs, Quality Control/Quality Assurance testing and management of many soil stabilization projects. We supply the proper cement/fly ash materials for projects on request. All soil testing is done to ensure proper amounts are mixed for the soil conditions. This is all done on an ongoing basis so that changes can be made in the field in regards to application rates.

We pride ourselves in this field and have many successes dealing with heavily loaded sections of roadway in the northwest area of Saskatchewan where heavy crude oil is transported by truck to refineries, rail transfer facilities and batteries. We have worked with both contractor and municipal governments in doing this type of work

R.M. OF MEADOW LAKE NO. 588 – ALCOTT CREEK DESIGN AND INSTALLATION

Resource Management was commissioned to design and provide construction management for the arched culvert crossing over Alcott Creek in the R.M. of Meadow Lake.  Special consideration was made for fish passage on this structure.

The construction was completed in 2012.

ALTEX ENERGY RAIL TRANSLOADING FACILITY - LASHBURN, SK

Altex's Lashburn Transload Terminal transfers of heavy crude from oil field trucks to Railway Tank Cars.  Resource Management was involved in Phase I, Phase II, and Phase III of the design and construction of the facility.  This included design for the Subgrade Preparation to meet the loading of the rail cars and heavy oil truck traffic, design of the tracks and spacing requirements.  During construction Resource Management was responsible for the Design, Construction Management and Quality Control for the site.